0 of 10 Questions completed
Questions:
You have already completed the exam before. Hence you can not start it again.
Exam is loading…
You must sign in or sign up to start the exam.
You must first complete the following:
0 of 10 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
What is the primary or precedent language for using the IPC/WHMA-A-620 standard?
Who has the responsibility to define the class of an assembly?
What word is used to identify a requirement?
Which Class of hardware requires a documented process control system with methodologies to be used during planning, implementation, and evaluation of manufacturing processes for producing cables and wire harness assemblies?
What is the allowable tolerance when using magnification to inspect wires and wire connections?
If you are inspecting an assembly with both 18 AWG and 24 AWG wires, what inspection range can you use for the entire assembly?
True or False: A manufacturer is required to inspect, clean, and maintain authorized tools and equipment, as well as prohibit all unauthorized tools and equipment from being in the work area.
Which IPC document is used to document terms and definitions for interconnecting and packaging electronic circuits?
What is the condition for a Class 3 assembly that has a length of lay of 16 times the outer diameter of the wire bundle?
What is the condition for a Class 2 assembly that has a requirement for 5 meter (m) cable that measures 4.99 m?